Thought I would post a couple pics of the first job I did with my 420c . The property we bought had no road in so I cut down a bunch of trees and brought in 30 some tandem loads od pit run from a nearby pit. The old 420 did very well even though the material had tp be pushed quite some distance.
that the raod in after after pushing the first few loads of material back.
thats all the material hauled in for the second round
thats where i quit till this spring when after doing a few repairs on the dozer we will increase the pad size.
Few pics of the job I had for my 420c
-
- 420 crawler
- Posts: 31
- Joined: Thu Mar 18, 2010 7:39 pm
Who is online
Users browsing this forum: No registered users and 34 guests