Show us pictures of your JD crawler and attachments.
-
gus
- 2010 crawler
![2010 crawler 2010 crawler](./images/ranks/wrench/spanner_rank_4.gif)
- Posts: 699
- Joined: Mon Jul 16, 2007 11:55 am
- Location: North West
-
Contact:
Post
by gus » Tue Apr 24, 2012 10:28 am
In the for what it's worth dept...
I have about one third of the cost of the rebuild in just the 3 pt, PTO and dozer blade. That includes buying the blade and PTO and building the 3 pt. The rest of the cost was parts, steel and the hydraulics. All new cylinders or fully rebuilt cylinders (3), new valve and miles of hose and fittings.
But.. it's what I need the 420 for. Push snow, cut weeds and the occasional dirt job.
Gus
-
gus
- 2010 crawler
![2010 crawler 2010 crawler](./images/ranks/wrench/spanner_rank_4.gif)
- Posts: 699
- Joined: Mon Jul 16, 2007 11:55 am
- Location: North West
-
Contact:
Post
by gus » Thu May 03, 2012 6:51 pm
Who is online
Users browsing this forum: No registered users and 11 guests