This first picture is the left side of the engine mostly assembled and ready to go on. Pretty compared to what it looked like coming off.
![Image](http://i161.photobucket.com/albums/t203/wwattson/IMG_001.jpg)
Here's the other side.
![Image](http://i161.photobucket.com/albums/t203/wwattson/IMG_004.jpg)
The crawler with the let side final drive installed. I had to stop at this point because any more weight on the back will tip the crawler off the front stands.
![Image](http://i161.photobucket.com/albums/t203/wwattson/IMG_003.jpg)
Here's the right side view right before I hung the engine.
![Image](http://i161.photobucket.com/albums/t203/wwattson/IMG_002.jpg)
And finally with the engine mounted. Feels good to see it coming together.
![Image](http://i161.photobucket.com/albums/t203/wwattson/IMG_0639.jpg)
All in all it was a pretty productive weekend. I'm planning on filling all the fluids this week and hooking up a temporary fuel tank so I can start it up and verify that the engine back is working before I start to final assemble the rest. I've still got a bunch of work to do on the track frames but its starting to look like a crawler again so I'm feeling like the end is in sight.
All for now. Let me know if this is starting to grate on anyone.